Project Delivery Method: Design-build (D-B)


Owner Team: Library building manager, facility manager, owner representative (consultant), and physician (consultant)


Project Delivery Team: D-B project manager, coordinator (mechanical-general construction), humidifier consultant, and humidifier service technician

HVAC Project Team: HVAC technician (in-house staff); automatic temperature control (ATC) technician (in-house staff); operation and maintenance technician (in-house staff); third-party commissioning consultant (CxC); third-party testing, adjusting, and balancing (TAB) contractor; and piping foreman


Application 2019 ASHRAE Handbook: Museums, Galleries, Archives, and Libraries, Chapter 24


Systems 2020 ASHRAE Handbook: Steam Systems, Chapter 11


Equipment 2020 ASHRAE Handbook: Jacketed steam humidifiers, Chapter 22, and gas-fired steam generator, Chapter 32


Project Type: Facility audit for IAQ, occupant health, and preservation of the books in the library with a focus on the HVAC infrastructure and capital project master plan following the 2019-2020 pandemic


References: Refer to the codes and standards located at the back of each ASHRAE Handbook for additional reference: 2019 ASHRAE Handbook, HVAC Applications; and 2020 ASHRAE Handbook, HVAC Systems and Equipment


Other References: ASHRAE Technical Committee TC 5.11, Humidifying and Equipment; and Technical Committee 2.10, Resilience and Security, Construction and Operation of Sustainable Buildings; ASHRAE Humidity Control Design Guide for Commercial and Institutional Buildings; ASHRAE Indoor-Air Quality Guide: Best Practice for Design, Construction, and Commissioning; ASHRAE Standard 55 (Thermal Environmental Conditions for Human Occupancy); and ASHRAE Standard 62.1 (IAQ); and Design-Build Institute of America (DBIA)


Output device, Font

DESIGN CRITERIA DOCUMENT

  • The HVAC system selection and design intent is based on the process outlined in ASHRAE Handbook 2020, Chapter 1, HVAC System Analysis and Selection, and includes the following:
    • Owner’s building program goals and additional goals
    • System constraints and constructability constraints
    • Finalized system selection based on methods to furnish and install humidification into the library facility
    • Specialized systems shall include a new gas-fired steam generator to produce the steam to new humidifiers in existing central air-handling units and specific areas of the building. Also, a new reverse-osmosis (RO) water system will serve the 100% water makeup to the steam generator.
    • Automatic controls shall include new direct digital steam humidification automation, boiler furnished controls, a BACnet interface, an internet interface, the existing building automation system (BAS) interface, and an interface with the existing computerized maintenance management software (CMMS) system interface
  • Program & Project Goal
    • Functional goals (refer to 2020 ASHRAE Handbook, Chapter 1)
    • Budget goals: first cost and operating cost
    • Timeline goal(s): pre-purchased equipment dates so the humidifiers will be in operation by the upcoming heating season
    • Management goals: A three-year extended warranty service contract for the new steam generator
  • Available utilities: Natural gas and 480/3/60 existing electrical power and BAS system
  • Existing conditions: central air system(s) supply air and/or return air cubic feet per minute (cfm), general and toilet exhaust, heating systems, and air conditioning systems
  • Rebalance and commission the building’s central air systems, new steam generator, humidifier systems, and RO system

DESIGN CRITERIA DOCUMENT

  • The HVAC design criteria shall be in sync with the project delivery method and owner’s project requirements
  • The design criteria shall be based on an analytical analysis of the existing facility, occupant, and HVAC conditions; associated operation; and proactive maintenance management
  • The D-B team will refer to the ASHRAE guide for humidity control design and ASHRAE Indoor Air Quality Guide: Best Practice for Design, Construction, and Commissioning
  • The addition of space humidification based on ASHRAE’s Humidity Control Design Guide
  • Owner’s facility environmental audit for space humidification and IAQ, occupant health, and preservation of the books in the library
  • An implementation update of all policy and procedure (P&P) manuals
  • Add humidifiers to recommended existing systems along with the addition of individual space humidifiers as recommended by the D-B humidifier consultant
  • Furnish, install, monitor, measure, and provide monthly reporting (if necessary) of humidity levels, space temperature, and outdoor air temperature
  • Add a new RO water system, serving new building humidifiers furnished and installed per the D-B scope of work
  • The in-house BAS technician will update any existing safeties and alarms associated with the new monitoring and reporting system working with the D-B team, third-party CxC, and third-party TAB technician
  • The facility manager shall have the BAS and operations and maintenance technicians trained to accommodate P&P changes as they affect the building management and HVAC systems
  • The D-B team shall produce complete record documents, warranties, and training
  • The D-B HVAC design engineer shall provide system flow diagrams with these three documents (OPR, DID, and BOD) along with ATC sequences of operation.

Photo courtesy of Unsplash

Material property, Rectangle, Fixture, Wood, Window, Font

Design Engineer’s Punchlist

Project Delivery Method:

  • Design-Build (D-B)
  • Integrated Project Delivery (IPD)
  • Construction Management @ Risk (CM) with Guaranteed Maximum Price (GMP)
  • Design-Bid-Build (D-B-B)

Owner Team

  • Library Building Manager
  • Facility Manager
  • Capital Project Manager
  • Owner Representative (consultant)
  • Library Book Manager (in-house staff)

Project Delivery Team

  • D-B Project Manager
  • D-B-B Project Manager
  • Coordinator (mechanical and general construction)
  • Humidifier Consultant
  • Architect, Acoustical, Plumbing, Electrical, Structural, Fire Protection, and Security Consultants

HVAC Project Team

  • HVAC Technician (in-house staff)
  • Automatic Temperature Control (ATC) Technician (in-house staff)
  • Building Automation System (BAS) Technician
  • Operation and Maintenance (O&M) Technician (in-house staff)
  • O&M Technician (out-source staff)
  • Third-Party Commissioning Consultant (CxC)

Application 2019 ASHRAE Handbook

  • Museums, Galleries, Archives, and Libraries, Chapter 24
  • Clean Space, Chapter 19
  • Library Space, Chapter 33
  • IAQ, Chapter 34

Systems 2020 ASHRAE Handbook

  • Steam Systems, Chapter 11
  • Condenser Water Systems, Chapter 14
  • Medium and High Temperature Water Heating, Chapter 15
  • Infrared Radiant Heating, Chapter 16

Equipment 2020 ASHRAE Handbook

  • Boilers, Chapter 32
  • Furnaces, Chapter 33
  • Chimney, Vent, and Fireplace Systems, Chapter 35
  • Heat Exchangers, Chapter 47

Project Type

  • Deferred Maintenance
  • Infrastructure
  • Energy Audit & Retrofit
  • Facility Audit for IAQ, Occupant Health, and Preservation of Books

References

  • 2017 ASHRAE Handbook – Fundamentals
  • 2018 ASHRAE Handbook – Refrigeration
  • 2019 ASHRAE Handbook – HVAC Applications
  • 2020 ASHRAE Handbook – HVAC Systems and Equipment
  • Refer to the Codes and Standards Located at the Back Each ASHRAE Handbook for Additional Reference

Other References

  • ASHRAE Practical Guide to Seismic Restraints
  • ASHRAE Standard for Commercial Building Energy Audits
  • ASHRAE TC 5.11, Humidifying and Equipment
  • ASHRAE TC 2.10, Resilience & Security
  • Design-Build Institute of America (DBIA)

DESIGN INTENT DOCUMENT (DID)

       The HVAC System Selection and Design Intent Is Based on the Process Outlined in ASHRAE Handbook 2020, Chapter 1, HVAC System Analysis and Selection, and Includes the Following:

  • Owner Building Program Goals and Additional Goals
  • System Constraints and Demolition Document
  • Finalized System Selection Based on Condensing Boiler Replacement Following the Building’s Deferred Maintenance Budget

Program & Project Goals

  • Budget Goals: First Cost and Operating Cost
  • Timeline Goal(s): Pre-Purchased Equipment is Provided so the Humidifiers will Be in Operation By the Upcoming Heating Season
  • Specialized Systems Shall Include New Gas-Fired Steam Generator to Produce the Steam to New Humidifiers in Existing Central Air-Handling Units and Specific Areas of the Building. Also, a New Reverse-Osmosis (RO) Water System will Serve the 100% Water Makeup to the Steam Generator.
  • Management Goals: A Three-Year Extended Warranty Service Contract Is Available for the Humidifiers and Piping System
  • Automatic Controls Shall Include Boiler Furnished Controls, a BACnet Interface, an Internet Interface, the Existing BAS Interface, and New Computerized Maintenance Management Software CMMS System Interface

DESIGN CRITERIA DOCUMENT

  • The HVAC Design Criteria Shall Be in Sync with the D-B Project Delivery Method and Owner’s Project Requirements
  • The Design Criteria Shall Be Based on ASHRAE 90.1 and State Energy Code
  • The Design Criteria Shall Be Based on an Analytical Analysis of the Existing Facility, Occupant, and HVAC Conditions; Associated Operation; and Proactive Maintenance Management
  • The New Insulated Hot Water System Shall Replace the Existing Pipe Distribution to Serve the Humidification System
  • Conceptual/Schematic Phase General Notes: The D-B Engineer Shall Coordinate this Project with the Architectural Design Team
  • The Owner’s Facility Environmental Audit for Space Humidification and IAQ, Occupant Health, and Preservation of the Books in the Library
  • An Implementation Update of All Policy and Procedure (P&P) Manuals
  • Add Humidifiers to Recommended Existing Systems Along with the Addition of Individual Space Humidifiers as Recommended By the D-B Humidifier Consultant



- ANSWERS marked in blue -

Project Delivery Method:

  • Design-Build (D-B)
  • Integrated Project Delivery (IPD)
  • Construction Management @ Risk (CM) with Guaranteed Maximum Price (GMP)
  • Design-Bid-Build (D-B-B)

Owner Team

  • Library Building Manager
  • Facility Manager
  • Capital Project Manager
  • Owner Representative (consultant)
  • Library Book Manager (in-house staff)

Project Delivery Team

  • D-B Project Manager
  • D-B-B Project Manager
  • Coordinator (mechanical and general construction)
  • Humidifier Consultant
  • Architect, Acoustical, Plumbing, Electrical, Structural, Fire Protection, and Security Consultants

HVAC Project Team

  • HVAC Technician (in-house staff)
  • Automatic Temperature Control (ATC) Technician (in-house staff)
  • Building Automation System (BAS) Technician
  • Operation and Maintenance (O&M) Technician (in-house staff)
  • O&M Technician (outsource staff)
  • Third-Party Commissioning Consultant (CxC)

Application 2019 ASHRAE Handbook

  • Museums, Galleries, Archives, and Libraries, Chapter 24
  • Clean Space, Chapter 19
  • Library Space, Chapter 33
  • IAQ, Chapter 34

Systems 2020 ASHRAE Handbook

  • Steam Systems, Chapter 11
  • Condenser Water Systems, Chapter 14
  • Medium and High Temperature Water Heating, Chapter 15
  • Infrared Radiant Heating, Chapter 16

Equipment 2020 ASHRAE Handbook

  • Boilers, Chapter 32
  • Furnaces, Chapter 33
  • Chimney, Vent, and Fireplace Systems, Chapter 35
  • Heat Exchangers, Chapter 47

Project Type

  • Deferred Maintenance
  • Infrastructure
  • Energy Audit and Retrofit
  • Facility Audit for IAQ, Occupant Health, and Preservation of Books

References

  • 2017 ASHRAE Handbook – Fundamentals
  • 2018 ASHRAE Handbook – Refrigeration
  • 2019 ASHRAE Handbook – HVAC Applications
  • 2020 ASHRAE Handbook – HVAC Systems and Equipment
  • Refer to the Codes and Standards Located at the Back Each ASHRAE Handbook for Additional Reference

Other References

  • ASHRAE Practical Guide to Seismic Restraints
  • ASHRAE Standard for Commercial Building Energy Audits
  • ASHRAE TC 5.11, Humidifying and Equipment
  • ASHRAE TC 2.10, Resilience and Security
  • Design-Build Institute of America (DBIA)

DESIGN INTENT DOCUMENT (DID)

       The HVAC System Selection and Design Intent Is Based on the Process Outlined in ASHRAE Handbook 2020, Chapter 1, HVAC System Analysis and Selection, and Includes the Following:

  • Owner Building Program Goals and Additional Goals
  • System Constraints and Demolition Document
  • Finalized System Selection Based on Condensing Boiler Replacement Following the Building’s Deferred Maintenance Budget

Program & Project Goals

  • Budget Goals: First Cost and Operating Cost
  • Timeline Goal(s): Pre-Purchased Equipment is Provided so the Humidifiers will Be in Operation By the Upcoming Heating Season
  • Specialized Systems Shall Include New Gas-Fired Steam Generator to Produce the Steam to New Humidifiers in Existing Central Air-Handling Units and Specific Areas of the Building. Also, a New Reverse-Osmosis (RO) Water System will Serve the 100% Water Makeup to the Steam Generator.
  • Management Goals: A Three-Year Extended Warranty Service Contract Is Available for the Humidifiers and Piping System
  • Automatic Controls Shall Include Boiler Furnished Controls, a BACnet Interface, an Internet Interface, the Existing BAS Interface, and New Computerized Maintenance Management Software CMMS System Interface

DESIGN CRITERIA DOCUMENT

  • The HVAC Design Criteria Shall Be in Sync with the D-B Project Delivery Method and Owner’s Project Requirements
  • The Design Criteria Shall Be Based on ASHRAE 90.1 and State Energy Code
  • The Design Criteria Shall Be Based on an Analytical Analysis of the Existing Facility, Occupant, and HVAC Conditions; Associated Operation; and Proactive Maintenance Management
  • The New Insulated Hot Water System Shall Replace the Existing Pipe Distribution to Serve the Humidification System
  • Conceptual/Schematic Phase General Notes: The D-B Engineer Shall Coordinate this Project with the Architectural Design Team
  • The Owner’s Facility Environmental Audit for Space Humidification and IAQ, Occupant Health, and Preservation of the Books in the Library
  • An Implementation Update of All Policy and Procedure (P&P) Manuals
  • Add Humidifiers to Recommended Existing Systems Along with the Addition of Individual Space Humidifiers as Recommended By the D-B Humidifier Consultant